NEXT Collaboration(Renner, J. et al), Benlloch-Rodriguez, J., Botas, A., Ferrario, P., Gomez-Cadenas, J. J., Alvarez, V., et al. (2017). Background rejection in NEXT using deep neural networks. J. Instrum., 12, T01004–21pp.
Abstract: We investigate the potential of using deep learning techniques to reject background events in searches for neutrinoless double beta decay with high pressure xenon time projection chambers capable of detailed track reconstruction. The differences in the topological signatures of background and signal events can be learned by deep neural networks via training over many thousands of events. These networks can then be used to classify further events as signal or background, providing an additional background rejection factor at an acceptable loss of efficiency. The networks trained in this study performed better than previous methods developed based on the use of the same topological signatures by a factor of 1.2 to 1.6, and there is potential for further improvement.
|
NEXT Collaboration(Martin-Albo, J. et al), Muñoz Vidal, J., Ferrario, P., Nebot-Guinot, M., Gomez-Cadenas, J. J., Alvarez, V., et al. (2016). Sensitivity of NEXT-100 to neutrinoless double beta decay. J. High Energy Phys., 05(5), 159–30pp.
Abstract: NEXT-100 is an electroluminescent high-pressure xenon gas time projection chamber that will search for the neutrinoless double beta (0v beta beta) decay of Xe-136. The detector possesses two features of great value for 0v beta beta searches: energy resolution better than 1% FWHM at the Q value of Xe-136 and track reconstruction for the discrimination of signal and background events. This combination results in excellent sensitivity, as discussed in this paper. Material-screening measurements and a detailed Monte Carlo detector simulation predict a background rate for NEXT-100 of at most 4 x 10(-4) counts keV(-1) kg(-1) yr(-1). Accordingly, the detector will reach a sensitivity to the 0v beta beta-decay half-life of 2.8 x 10(25) years (90% CL) for an exposure of 100 kg.year, or 6.0 x 10(25) years after a run of 3 effective years.
|