|
Records |
Links ![sorted by URL field, descending order (down)](img/sort_desc.gif) |
|
Author |
n_TOF Collaboration (Patronis, N. et al); Babiano-Suarez, V.; Balibrea Correa, J.; Domingo-Pardo, C.; Ladarescu, I.; Lerendegui-Marco, J. |
![find record details (via OpenURL) openurl](img/xref.gif)
|
|
Title |
Status report of the n_TOF facility after the 2nd CERN long shutdown period |
Type |
Journal Article |
|
Year |
2023 |
Publication |
EPJ Techniques and Instrumentation |
Abbreviated Journal |
EPJ Tech. Instrum. |
|
|
Volume |
10 |
Issue |
1 |
Pages |
13 - 10pp |
|
|
Keywords |
Neutron time of flight; Spallation target; Nuclear astrophysics; Neutron physics; Neutron induced fission; Neutron reactions |
|
|
Abstract |
During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the nTOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the nTOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported. |
|
|
Address |
[Patronis, N.; Goula, S.; Eleme, Z.; Stamati, M. E.; Vagena, E.] Univ Ioannina, Ioannina, Greece, Email: nikolaos.patronis@cern.ch |
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
Springer |
Place of Publication |
|
Editor |
|
|
|
Language |
English |
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
2195-7045 |
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
WOS:001008786600001 |
Approved |
no |
|
|
Is ISI |
yes |
International Collaboration |
yes |
|
|
Call Number |
IFIC @ pastor @ |
Serial |
5591 |
|
Permanent link to this record |
|
|
|
|
Author |
Belver, D.; Cabanelas, P.; Castro, E.; Garzon, J.A.; Gil, A.; Gonzalez-Diaz, D.; Koenig, W.; Traxler, M. |
![find record details (via OpenURL) openurl](img/xref.gif)
|
|
Title |
Performance of the Low-Jitter High-Gain/Bandwidth Front-End Electronics of the HADES tRPC Wall |
Type |
Journal Article |
|
Year |
2010 |
Publication |
IEEE Transactions on Nuclear Science |
Abbreviated Journal |
IEEE Trans. Nucl. Sci. |
|
|
Volume |
57 |
Issue |
5 |
Pages |
2848-2856 |
|
|
Keywords |
Charge to width algorithm; fast amplifying and digitizing electronics; front-end electronics; HADES; time of flight; timing RPC |
|
|
Abstract |
A front-end electronics (FEE) chain for accurate time measurements has been developed for the new Resistive Plate Chamber (RPC)-based Time-of-Flight (TOF) wall of the High Acceptance Di-Electron Spectrometer (HADES). The wall covers an area of around 8 m(2) divided in 6 sectors. In total, 1122 4-gap timing RPC cells are read-out by 2244 time and charge sensitive channels. The FEE chain consists of 2 custom-made boards: a 4-channel Daughter BOard(DBO) and a 32-channel MotherBOard (MBO). The DBO uses a fast 2 GHz amplifier feeding a dual high-speed discriminator. The time and charge information are encoded, respectively, in the leading edge and the width of an LVDS signal. Each MBO houses up to 8 DBOs providing them regulated voltage supply, threshold values via DACs, test signals and, additionally, routing out a signal proportional to the channel multiplicity needed for a 1st level trigger decision. The MBO delivers LVDS signals to a multi-purpose Trigger Readout Board (TRB) for data acquisition. The FEE allows achieving a system resolution around 75 ps fulfilling comfortably the requirements of the HADES upgrade [1]. The commissioning of the whole RPC wall is finished and the 6 sectors are already mounted in their final position in the HADES spectrometer and ready to take data during the beam-times foreseen for 2010. |
|
|
Address |
[Belver, Daniel; Cabanelas, P.; Castro, E.; Garzon, J. A.] Univ Santiago Compostela, LabCAF, Santiago De Compostela 15782, Spain, Email: daniel.belver@usc.es |
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
Ieee-Inst Electrical Electronics Engineers Inc |
Place of Publication |
|
Editor |
|
|
|
Language |
English |
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
0018-9499 |
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
ISI:000283440400007 |
Approved |
no |
|
|
Is ISI |
yes |
International Collaboration |
yes |
|
|
Call Number |
IFIC @ elepoucu @ |
Serial |
349 |
|
Permanent link to this record |