|   | 
Details
   web
Record
Author n_TOF Collaboration (Patronis, N. et al); Babiano-Suarez, V.; Balibrea Correa, J.; Domingo-Pardo, C.; Ladarescu, I.; Lerendegui-Marco, J.
Title Status report of the n_TOF facility after the 2nd CERN long shutdown period Type Journal Article
Year 2023 Publication EPJ Techniques and Instrumentation Abbreviated Journal EPJ Tech. Instrum.
Volume 10 Issue 1 Pages 13 - 10pp
Keywords Neutron time of flight; Spallation target; Nuclear astrophysics; Neutron physics; Neutron induced fission; Neutron reactions
Abstract During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the nTOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the nTOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported.
Address [Patronis, N.; Goula, S.; Eleme, Z.; Stamati, M. E.; Vagena, E.] Univ Ioannina, Ioannina, Greece, Email: nikolaos.patronis@cern.ch
Corporate Author Thesis
Publisher Springer Place of Publication (up) Editor
Language English Summary Language Original Title
Series Editor Series Title Abbreviated Series Title
Series Volume Series Issue Edition
ISSN 2195-7045 ISBN Medium
Area Expedition Conference
Notes WOS:001008786600001 Approved no
Is ISI yes International Collaboration yes
Call Number IFIC @ pastor @ Serial 5591
Permanent link to this record