|
SuperNEMO Collaboration(Argyriades, J. et al), Carcel, S., Diaz, J., Monrabal, F., Serra, L., & Yahlali, N. (2010). Results of the BiPo-1 prototype for radiopurity measurements for the SuperNEMO double beta decay source foils. Nucl. Instrum. Methods Phys. Res. A, 622(1), 120–128.
Abstract: The development of BiPo detectors is dedicated to the measurement of extremely high radiopurity in (TI)-T-208 and Bi-214 for the SuperNEMO double beta decay source foils. A modular prototype, called BiPo-1, with 0.8 m(2) of sensitive surface area, has been running in the Modane Underground Laboratory since February, 2008. The goal of BiPo-1 is to measure the different components of the background and in particular the surface radiopurity of the plastic scintillators that make up the detector. The first phase of data collection has been dedicated to the measurement of the radiopurity in (TI)-T-208. After more than one year of background measurement, a surface activity of the scintillators of A((TI)-T-208) = 1.5 μBq/m(2) is reported here. Given this level of background, a larger BiPo detector having 12 m(2) of active surface area, is able to qualify the radiopurity of the SuperNEMO selenium double beta decay foils with the required sensitivity of A((TI)-T-208) <2 μBq/kg (90% CL.) with a six month measurement.
|
|
|
Mistry, A. K. et al, Tain, J. L., Agramunt, J., Algora, A., Guadilla, V., Morales, A. I., et al. (2022). The DESPEC setup for GSI and FAIR. Nucl. Instrum. Methods Phys. Res. A, 1033, 166662–18pp.
Abstract: The DEcay SPECtroscopy (DESPEC) setup for nuclear structure investigations was developed and commissioned at GSI, Germany in preparation for a full campaign of experiments at the FRS and Super-FRS. In this paper, we report on the first employment of the setup in the hybrid configuration with the AIDA implanter coupled to the FATIMA LaBr3(Ce) fast-timing array, and high-purity germanium detectors. Initial results are shown from the first experiments carried out with the setup. An overview of the setup and function is discussed, including technical advancements along the path.
|
|
|
Gil, A., Blanco, A., Castro, E., Diaz, J., Garzon, J. A., Gonzalez-Diaz, D., et al. (2012). The slow control system of the HADES RPC wall. Nucl. Instrum. Methods Phys. Res. A, 661, S118–S120.
Abstract: The control and monitoring system for the new HADES RPC time of flight wall installed at GSI Helmholtzzentrum fur Schwerionenforschung GmbH (Darmstadt, Germany), is described. The slow control system controls/monitors about 6000 variables from different physical devices via a distributed architecture, which uses intensively the 1-wire (R) bus. The software implementation is based on the Experimental Physics and Industrial Control System (EPICS) software tool kit providing low cost, reliability and adaptability without requiring large hardware resources. The control and monitoring system attends five different subsystems: front-end electronics, low voltage, high voltage, gases, and detector. (C) 2010 Elsevier B.V. All rights reserved.
|
|
|
Belle-II DEPFET and PXD Collaboration(Ye, H. et al), Boronat, M., Esperante, D., Fuster, J., Gomis, P., Lacasta, C., et al. (2021). Commissioning and performance of the Belle II pixel detector. Nucl. Instrum. Methods Phys. Res. A, 987, 164875–5pp.
Abstract: The Belle II experiment at the SuperKEKB energy-asymmetric e(+)e(-) collider has completed a series of substantial upgrades and started collecting data in 2019. The experiment is expected to accumulate a data set of 50 ab(-1) to explore new physics beyond the Standard Model at the intensity frontier. The pixel detector (PXD) of Belle II plays a key role in vertex determination. It has been developed using the DEpleted P-channel Field Effect Transistor (DEPFET) technology, which combines low power consumption in the active pixel area and low intrinsic noise with a very small material budget. In this paper, commissioning and performance of the PXD measured with first collision data are presented.
|
|
|
Natochii, A. et al, & Marinas, C. (2023). Measured and projected beam backgrounds in the Belle II experiment at the SuperKEKB collider. Nucl. Instrum. Methods Phys. Res. A, 1055, 168550–21pp.
Abstract: The Belle II experiment at the SuperKEKB electron-positron collider aims to collect an unprecedented data set of 50 ab-1 to study CP-violation in the B-meson system and to search for Physics beyond the Standard Model. SuperKEKB is already the world's highest-luminosity collider. In order to collect the planned data set within approximately one decade, the target is to reach a peak luminosity of 6 x 1035 cm-2 s-1by further increasing the beam currents and reducing the beam size at the interaction point by squeezing the betatron function down to betay* = 0.3 mm. To ensure detector longevity and maintain good reconstruction performance, beam backgrounds must remain well controlled. We report on current background rates in Belle II and compare these against simulation. We find that a number of recent refinements have significantly improved the background simulation accuracy. Finally, we estimate the safety margins going forward. We predict that backgrounds should remain high but acceptable until a luminosity of at least 2.8 x 1035 cm-2 s-1is reached for betay* = 0.6 mm. At this point, the most vulnerable Belle II detectors, the Time-of-Propagation (TOP) particle identification system and the Central Drift Chamber (CDC), have predicted background hit rates from single-beam and luminosity backgrounds that add up to approximately half of the maximum acceptable rates.
|
|
|
Belle-II DEPFET and PXD Collaborations(Wang, B. et al), & Marinas, C. (2022). Operational experience of the Belle II pixel detector. Nucl. Instrum. Methods Phys. Res. A, 1032, 166631–7pp.
Abstract: The Belle II experiment at the SuperKEKB accelerator has started its physics data taking with the full detector setup in March 2019. It aims to collect 40 times more e+e- collision data compared with its predecessor Belle experiment. The Belle II pixel detector (PXD) is based on the Depleted P-channel Field Effect Transistor (DEPFET) technology. The PXD plays an important role in the tracking and vertexing of the Belle II detector. Its two layers are arranged at radii of 14 mm and 22 mm around the interaction point. The sensors are thinned down to 75 μm to minimize multiple scattering, and each module has interconnects and ASICs integrated on the sensor with silicon frames for mechanical support. PXD showed good performance during data taking. It also faces several operational challenges due to the high background level from the SuperKEKB accelerator, such as the damage from beam loss events, the drift in the HV working point due to radiation effect, and the impact of the high background.
|
|
|
Wieduwilt, P., Paschen, B., Schreeck, H., Schwenker, B., Soltau, J., Ahlburg, P., et al. (2021). Performance of production modules of the Belle II pixel detector in a high-energy particle beam. Nucl. Instrum. Methods Phys. Res. A, 991, 164978–15pp.
Abstract: The Belle II experiment at the Super B factory SuperKEKB, an asymmetric e(+) e(-) collider located in Tsukuba, Japan, is tailored to perform precision B physics measurements. The centre of mass energy of the collisions is equal to the rest mass of the gamma (4S) resonance of m(gamma(4S)) = 10.58 GeV. A high vertex resolution is essential for measuring the decay vertices of B mesons. Typical momenta of the decay products are ranging from a few tens of MeV to a few GeV and multiple scattering has a significant impact on the vertex resolution. The VerteX Detector (VXD) for Belle II is therefore designed to have as little material as possible inside the acceptance region. Especially the innermost two layers, populated by the PiXel Detector (PXD), have to be ultra-thin. The PXD is based on DEpleted P-channel Field Effect Transistors (DEPFETs) with a thickness of only 75 μm. Spatial resolution and hit efficiency of production detector modules were studied in beam tests performed at the DESY test beam facility. The spatial resolution was investigated as a function of the incidence angle and improvements due to charge sharing are demonstrated. The measured module performance is compatible with the requirements for Belle II.
|
|
|
BABAR Collaboration(Aubert, B. et al), Azzolini, V., Lopez-March, N., Martinez-Vidal, F., Milanes, D. A., & Oyanguren, A. (2013). The BABAR detector: Upgrades, operation and performance. Nucl. Instrum. Methods Phys. Res. A, 729, 615–701.
Abstract: The BABAR detector operated successfully at the PEP-Il asymmetric e(+) e(-) collider at the SLAC National Accelerator Laboratory from 1999 to 2008. This report covers upgrades, operation, and performance of the collider and the detector systems, as well as the trigger, online and offline computing, and aspects of event reconstruction since the beginning of data taking.
|
|
|
Bolle, E., Casella, C., Chesi, E., De Leo, R., Dissertori, G., Fanti, V., et al. (2012). AX-PET: A novel PET concept with G-APD readout. Nucl. Instrum. Methods Phys. Res. A, 695, 129–134.
Abstract: The AX-PET collaboration has developed a novel concept for high resolution PET imaging to overcome some of the performance limitations of classical PET cameras, in particular the compromise between spatial resolution and sensitivity introduced by the parallax error. The detector consists of an arrangement of long LYSO scintillating crystals axially oriented around the field of view together with arrays of wave length shifter strips orthogonal to the crystals. This matrix allows a precise 3D measurement of the photon interaction point. This is valid both for photoelectric absorption at 511 key and for Compton scattering down to deposited energies of about 100 keV. Crystals and WLS strips are individually read out using Geiger-mode Avalanche Photo Diodes (G-APDs). The sensitivity of such a detector can be adjusted by changing the number of layers and the resolution is defined by the crystal and strip dimensions. Two AX-PET modules were built and fully characterized in dedicated test set-ups at CERN, with point-like Na-22 sources. Their performance in terms of energy (Renew approximate to 11.8% (FWMH) at 511 key) and spatial resolution was assessed (sigma(axial) approximate to 0.65 mm), both individually and for the two modules in coincidence. Test campaigns at ETH Zurich and at the company AAA allowed the tomographic reconstructions of more complex phantoms validating the 3D reconstruction algorithms. The concept of the AX-PET modules will be presented together with some characterization results. We describe a count rate model which allows to optimize the planing of the tomographic scans.
|
|
|
Valero, A., Castillo Gimenez, V., Ferrer, A., Gonzalez, V., Hernandez Jimenez, Y., Higon-Rodriguez, E., et al. (2011). The ATLAS tile calorimeter ROD injector and multiplexer board. Nucl. Instrum. Methods Phys. Res. A, 629(1), 74–79.
Abstract: The ATLAS Tile Calorimeter is a sampling detector composed by cells made of iron-scintillator tiles. The calorimeter cell signals are digitized in the front-end electronics and transmitted to the Read-Out Drivers (RODs) at the first level trigger rate. The ROD receives triggered data from up to 9856 channels and provides the energy, phase and quality factor of the signals to the second level trigger. The back-end electronics is divided into four partitions containing eight RODs each. Therefore, a total of 32 RODs are used to process and transmit the data of the TileCal detector. In order to emulate the detector signals in the production and commissioning of ROD modules a board called ROD Injector and Multiplexer Board (RIMBO) was designed. In this paper, the RIMBO main functional blocks, PCB design and the different operation modes are described. It is described the crucial role of the board within the TileCal ROD test-bench in order to emulate the front-end electronics during the validation of ROD boards as well as during the evaluation of the ROD signal reconstruction algorithms. Finally, qualification and performance results for the injection operation mode obtained during the Tile Calorimeter ROD production tests are presented.
|
|