TY - JOUR AU - n_TOF Collaboration (Patronis, N. et al AU - Babiano-Suarez, V. AU - Balibrea Correa, J. AU - Domingo-Pardo, C. AU - Ladarescu, I. AU - Lerendegui-Marco, J. PY - 2023 DA - 2023// TI - Status report of the n_TOF facility after the 2nd CERN long shutdown period T2 - EPJ Tech. Instrum. JO - EPJ Techniques and Instrumentation SP - 13 - 10pp VL - 10 IS - 1 PB - Springer KW - Neutron time of flight KW - Spallation target KW - Nuclear astrophysics KW - Neutron physics KW - Neutron induced fission KW - Neutron reactions AB - During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n_TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported. SN - 2195-7045 UR - https://doi.org/10.1140/epjti/s40485-023-00100-w DO - 10.1140/epjti/s40485-023-00100-w LA - English N1 - WOS:001008786600001 ID - n_TOFCollaborationPatronis_etal2023 ER -