@Article{n_TOFCollaborationPatronis_etal2023, author="n{\_}TOF Collaboration (Patronis, N. et al and Babiano-Suarez, V. and Balibrea Correa, J. and Domingo-Pardo, C. and Ladarescu, I. and Lerendegui-Marco, J.", title="Status report of the n{\_}TOF facility after the 2nd CERN long shutdown period", journal="EPJ Techniques and Instrumentation", year="2023", publisher="Springer", volume="10", number="1", pages="13 - 10pp", optkeywords="Neutron time of flight; Spallation target; Nuclear astrophysics; Neutron physics; Neutron induced fission; Neutron reactions", abstract="During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n{\textit{}TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n{}}TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n{\_}TOF facility. Furthermore, some indicative current and future measurements are briefly reported.", optnote="WOS:001008786600001", optnote="exported from refbase (https://references.ific.uv.es/refbase/show.php?record=5591), last updated on Wed, 09 Aug 2023 09:05:11 +0000", issn="2195-7045", doi="10.1140/epjti/s40485-023-00100-w", opturl="https://doi.org/10.1140/epjti/s40485-023-00100-w", language="English" }